Friday, April 28, 2017

Wow!

I drove up to find two garage doors installed!


And inside the front closet - can it be?  The tile is here!


The tile is in in the kitchen area.



Another view of the Masterbathroom Mosaic Tile floor.


Master Bedroom awaiting tile.


Another view of the tile.


Tile stacked in the garage.


Inside the oh so clean garage.


Tile.


Another kitchen area view.


Basement tile.


The last basement window is in.  (Center paine to be replaced.) 


Electrical box.







Add caption






Wednesday, April 26, 2017

Adjustments

144 Webster Avenue


The lift shaft window.

The bedroom fix.

More tile in the MBath

Looking directly into the shower.


The Great Room Light Shelf fix.

Basement tile 







One window still needs to be exchanged.

Light shelf correction


Tuesday, April 25, 2017

Updates today....

Roll-in-shower

"Door Wall" and hall to Master Bedroom

This entryway needs to be adjusted to allow the light shelf to continue across it.



Tada!  The correct windows with prairie grids are being installed.  


Filling in the floor deficits.


The "waterfall" tile in Mark's shower.

The niche in Mark's shower.

Um, not quite what is needed.  A surfeit of light shelf. Corrections underway.

Master bedroom wall to bathroom.

Basement tile going in.


The lift has arrived.

Lift parts.

Basement floor tile from the other side.

The first cherry blossom from our favorite tree, De Pere.