Thursday, December 29, 2016

A trip to Appleton with Caroline and Raghav....

Front corner of house where Mark's office will be - and I assume Rio will claim the window seat.

Looking back towards where the tree was. The windows are in the bathroom and Althea's room.

Looking past the guest coat closet toward the front door, the stairwell and lift shaft, and the door to the garage.

Front window in Mark's office.

From the inside, bathroom window on left, office side window.

Looking across house to the door to the covered patio, the masterbedroom door to the covered patio and three other windows in the masterbedroom.

Front of house on left looking toward masterbed/bath side of house.

Corner window in greatroom looking out right side of house.

Our lead carpenter, Raghav and Caroline.

Friday, December 23, 2016

Just before the snow began to come down in earnest........

The subfloor is complete!
The subfloor with plywood and 2x4 covering the opening



There is a small vertical crack
 in the back wall of the covered patio....


Seth and Rio checking it out...




This is where the pan for the roll in shower will be.

The tree is down and cut.  The stump is being ground up.

Merry Christmas everyone!  We love you!

Patty & Mark

Thursday, December 22, 2016

I wish you could smell the wonderful smell of lumber.......

Jason's Tree Service was at the site. They cleaned out some branches and will have the entire crew out tomorrow to take the tree down.  Please plan to come and sit around our fire pit next summer and fall!
Here you can see some branches have been cut out of the tree.

It is so exciting to see the sub floor going in.  It looks beautiful.  You can see the tree lift in the background. Our neighbors are being very generous with their yard and electricity.






Wednesday, December 21, 2016

More joists! And inner wall framing. Tree is still here.


Looking past the stairwell/lift towards family room and two smaller bedrooms.


 Tree to be taken down this week.
 Lift/stairwell opening

Master bedroom/bathroom/closet area

Tuesday, December 20, 2016

It's beginning to look like we can put a floor on it!

Today after school here is what I found:





Temperature was up to +39 today according to my car thermometer.  Such fluctuation!  Ah well, it is Wisconsin, afterall.

Monday, December 19, 2016

Monday After School

Here is the latest look.  Not much you can do when the wind chills are hovering around -30 degrees Fahrenheit.



Quick Drive By Photo

Its' a Portapotty and a Trailer!
Snow and bitter cold predicted.

Saturday, December 10, 2016

Suprise! It's a wall! (Friday, 9 Dec 16)

                              Lumber













Back wall of basement framed in.

  • House will be framed before basement floor is poured.
  • Lift will be dropped through the space in the framing.
  • Tree will be cut down this coming week.