Friday, March 31, 2017

End of March update.

Window in back of shaft wall, before plastering.

Laundry room.

Plasterer's equipment


Plastered stairwell






Looking at the lift shaft window from the stairs.

Yes, dining table light goes here.



Friday, March 24, 2017

Collection of recent updates.


Paper paper everywhere - in preparation for plastering.



Masterbath privacy wall.

Basement walls being framed in.






Basement shower.


Lift shaft has been erroneously sheet rocked in: this will 
be changed to let light into the lift and the house.

Friday, March 17, 2017

Happy St. Patrick's Day!

More siding completed. All being done by one man.



Original floor tile choice not an option - here are more.  Now to decide!

Siding and sunshine.

Looking north.


The borded up window space is where they're going to load the lift.


Privacy wall needed..... MBR

Tuesday, March 14, 2017

Updates...

Back porch with siding.

Great room, looking south.

Thermostat

Faux stone....



Right pillar base allignment

Left pillar base

Right pillar base





Electrical panel

At base of lift shaft.

Looking into kitchen and bathroom downstairs.

Lift exit in basement.

The furnace.

Monday, March 6, 2017

Rainy day...

The steps!


Looking back up the steps.


My first look at the basement.


Sump pump pit.


They said they would hang the furnace. 

 Here it is levitating off of the floor.


A puddle.....


The furnace.


The basement windows.


Looking toward the basement under the masterbedroom.


Part of the basement will be finished.




Corner of the basement.  Not sure what this all is.